Monkstown
Premium Garden Room — Installed in Ireland From €28K Compact 16m² studio for living, working, and relaxing. Fully turnkey with smart-home features, fitted kitchen, and bathroom.- Installed across Ireland
- Planning guidance available
- Site preparation service available
- Delivery in 14 weeks
Visual Overview
Smart, compact, and ready for your garden.
Perfect for Different Uses
Layout configurations tailored to your lifestyle.
What’s Included in the Monkstown
The unit comes fully finished from factory. No construction on site. No long rion.
We Prepare Your Site Before Installation
Every site is different.
We help with preparation, foundations, utilities and access so installation goes smoothly.
We can organise full site preparation in Ireland including:
1. Site inspection
Before installation we carry out a site inspection to assess access, ground conditions and existing services.
This allows us to advise the correct installation method and confirm what is required under Irish regulations.
Site inspection fee is €150, which covers travel and assessment.
If you proceed with the order, this amount is fully deducted from the final invoice.
We can arrange inspection anywhere in Ireland.
Contact us2. Garden clearance
In some cases the garden needs preparation before installation.
This may include removal of sheds, trees, fences or other structures to create safe access and space for the unit.
We work with trusted local contractors and can organise the preparation if required.
Ask about preparation3. Levelling
The installation area must be level and properly prepared.
Ground works may be required to ensure safe placement and long-term stability of the unit.
Preparation requirements vary for every property and are assessed after inspection.
Send photos for advice4. Concrete base or ground screws
Depending on ground conditions, the unit may be installed on a concrete base or ground screw system.
We recommend the most suitable solution after site inspection.
Base works can be arranged through our contractor network if needed.
Site inspection fee €150 may apply and is deducted if the order proceeds.
Request recommendation5. Electrical connection
Capsule homes are normally connected to the existing electrical supply of the main house.
All electrical works in Ireland must be completed by a registered electrician, who will issue the required certification.
Air conditioning / heat pump must be connected by a qualified AC specialist.
We can coordinate certified contractors if required.
Connection cost depends on distance and site conditions.
Site inspection (€150) may be required and is deducted if the order proceeds.
6. Plumbing / drainage
Water and drainage are usually connected to the existing system of the main house.
If your property has mains connection or septic tank, the unit can normally be linked to it.
If there is no connection, new pipes, drainage or septic system may be required.
All works must be completed by qualified contractors in accordance with Irish standards.
Site inspection (€150) may be required and is deducted from the invoice if you proceed.
Check plumbing options7. Crane access planning
Capsule homes are delivered fully built and installed by crane.
Before delivery we check access, lifting distance and positioning to ensure safe installation.
In some cases fence or garden adjustments may be required.
Installation usually takes one day once the site is ready.
Site inspection (€150) may be required and is deducted if the order proceeds.
Check access8. Fence / garden adjustments
For delivery, parts of the fence, gate or garden may need temporary removal.
These adjustments are planned in advance and can be organised by our team if required.
All details are confirmed before installation.
Discuss garden layout9. Connection to main house
In most Irish installations the capsule home is placed in the back garden and connected to the main house for electricity, water and drainage.
After site inspection we explain exactly what is required for your property.
We can coordinate electricians, plumbers and ground works if needed.
Site inspection fee €150 applies.
This amount is deducted from the final invoice if you proceed.
Installation requirements may vary depending on the property.
We will advise after inspection.
Site inspection fee €150 applies.
This amount is fully deducted from the final invoice if you proceed with the order.
Planning Permission & Architect Support
We work with architects in Ireland who can help with:
- Garden room & housing rules
- Planning permission if required
- Site layout advice
- Foundation recommendations
- Compliance
This helps avoid mistakes before ordering the unit.
Packages
Different packages available depending on your site.
Technical Specification
Blueprint of the Monkstown capsule. Engineered for longevity. Tap to expand.
Structure
- Frame: Galvanized Steel Structure
- Shell: Aviation Aluminum Façade
- Lifespan: 65+ years rust-proof design
Roof
- Material: Aluminum Honeycomb Panel
- Insulation: 100mm Polyurethane Shield
- Finish: Waterproof & Ultra-lightweight
Wall
- Exterior: Aviation Aluminum
- Insulation: High-density Polyurethane
- Internal: Fiber Cement Layer (Fireproof Class A)
Glass
- Type: LOW-E Mirror Glass
- Privacy: Reflective outside, clear inside
- Thermal: Blocks 99% UV rays, keeps heat inside
Smart Home
- Control: Voice control & App integration
- Lighting: Ambient LED strips throughout
- Access: Smart Door Lock system
Bathroom
- Shower: Matte black, high-pressure system
- Toilet: Siphonic flush system
- Ventilation: Built-in exhaust
Engineering
Galvanized steel & Aviation Aluminum
Wind Level 12 / Quake Level 7
100mm Polyurethane layer
Double glazing soundproofing
Optional Upgrades
Customize your space. Tap to view details.
Premium Kitchen Pack
Underfloor Heating
Exterior Pergola System
Smart Projector System
Built-in Wardrobes
Panoramic Terrace
Double Bed (2.0 × 1.8 m)
3-Step Metal Stairs
Full-Height Outdoor Terrace
How the Process Works
1. Site Check
We inspect your site, access, and ground conditions.2. Quote
You get a final price including capsule, transport, and site prep.3. Order
Secure your slot and we begin manufacturing.4. Production
Precision manufacturing takes approx. 12-14 weeks.5. Delivery
Transport to your property in Ireland.6. Installation
Lifted by crane and installed in JUST 1 DAY.Capsule Homes Ireland
Installed in Ireland. BigSur Limited, Dublin.
- Local company
- Support across Ireland
- Real installations
- Consultation available
Want to install Monkstown on your property?
Send us your address and we will check your site.